Engineering management

One record for every part, BOM and change.

Altrevo Systems keeps part numbers, bills of materials, projects, planning, purchasing and inventory in one place, so design, purchasing, stores and the build team all work from the same numbers, with no more copying between spreadsheets.

Altrevo Systems
  • Replaces the spreadsheets
  • Every change on record
  • Tailored to your business

Your operation shouldn't run on copy and paste.

Many engineering companies still run their operations on a patchwork of Excel files: a BOM here, a part list there, a purchasing tracker, a stock sheet, a build checklist. Each one repeats the others, and people keep them in step by hand. It works, until a wrong revision reaches the build floor.

  1. Copy and paste between files

    The same part number, description and quantity are pasted into the BOM, the order tracker and the stock sheet.

    Entered once, used everywhere.

    A part, its revision and its quantities live in one record that every team reads from.

  2. Visual checks

    Two spreadsheets side by side, scrolling line by line to spot what changed.

    Changes tracked, not spotted.

    Every edit is recorded with who and when, and differences between revisions and baselines are shown for you.

  3. Typing the same data again

    Delivery dates from purchasing re-typed into the BOM; stock counts re-typed into the build plan.

    Data flows between teams.

    Orders, stock and dates feed the BOM, the plan and every dashboard automatically.

  4. Which file is the right one?

    v7_FINAL, v7_FINAL_JM, v8_draft. Mistakes show up on the build floor.

    One version of the truth.

    Everyone works on the same live record, with edit rights by role, so the BOM on the shop floor is the BOM in engineering.

Less time keeping spreadsheets in step. More time engineering.

From first sketch to release

Spreadsheets drift apart the moment a second person opens them. Altrevo Systems keeps one record per part and lets every team see it their way.

  1. 01

    Number

    Create the part once.

    Every part gets its number the moment it is created, and duplicates are caught before they are saved.

  2. 02

    Structure

    Build the BOM.

    Typed like a spreadsheet or pasted straight from Excel, and shared by design, purchasing and the build team.

  3. 03

    Build

    Order, pick and assemble.

    Orders and stock live in the same system as the BOM, so everyone can see what is ready to build and what is not.

  4. 04

    Change & release

    Control every change.

    Every change is requested, approved and recorded on the same parts and BOMs, through to release.

One platform, fourteen modules

Fourteen modules on one data model, all under one roof. Engineering, operations, change and quality share the same records, so there are no separate tools to keep in step, and every role sees what matters to it on its own dashboard.

Group 1

Engineering data

M-01

Part creation

One parts register with automatic numbering and a full revision history.

M-02

Bills of materials

Indented and flat BOMs, shared by design, purchasing and the build team.

M-03

Documentation

Drawings, specifications and reports kept with the parts they describe.

M-04

Engineering change requests (ECR)

Propose, assess, approve and carry out engineering changes.

Group 2

Projects & operations

M-05

Projects

Every project in one view, with its own team and roles.

M-06

Planning

Project stages and dates, kept in step with the parts they depend on.

M-07

Tasks

Who does what by when, across every team.

M-08

Purchasing

What every project still has to buy, and where each order stands.

M-09

Inventory

Stock and shortages for every part, in the same system as your BOMs and orders.

Group 3

Release & quality

M-10

Project release

Release gates for each stage, with a frozen baseline at every release.

M-11

CCAR

Corrective actions from issue to close-out, tied to the parts concerned.

M-12

DFMEA

Design failure mode analysis built on your BOMs.

M-13

Process FMEA

Failure mode analysis for manufacturing and assembly steps.

Across everything

Role dashboards

M-14

Role dashboards

Every role opens on its own dashboard: what is due, what is late and what needs a decision.

Every module is best seen working. We'll walk you through the ones that matter to your team in a live demo.

Book a demo

Change control, connected end to end

When a part changes, everything that depends on it should know. Altrevo Systems shows the impact of a change before it is approved, and keeps it on record through to release.

  1. 01

    Request

    Raised wherever the issue is found.

  2. 02

    Impact

    Everything the change touches, shown before anyone decides.

  3. 03

    Approve

    Signed off by the right people, every decision on record.

  4. 04

    Implement

    New revisions and the work for each team, issued together.

  5. 05

    Release

    Released only when nothing is left open.

See a real change go from request to release, on your own parts, in a demo.

Book a demo

Delivered as your own installation

Each customer gets a separate installation of Altrevo Systems with its own database, on its own servers. Nothing is shared with anyone else.

Your installation

Runs on your Linux server with Docker and PostgreSQL, behind your firewall. IT gets an install guide, nightly backup and restore steps, and versioned upgrades.

Runs on
Linux · Docker · PostgreSQL
Sign-in
Microsoft Entra ID or emailed code
Upgrades
Versioned releases with notes

Your data

Your parts, BOMs and history stay in your database. Every change is on record, and your data can be taken out at any time. One nightly backup holds everything, pictures included, and it stays with you.

Audit trail
Every change, who and when
Permissions
By role
In and out
Excel and CSV import and export
Backups
Nightly, on your own servers

Built around the way you work.

No two engineering businesses run the same way. You have your own numbering scheme, your own approval chain, the columns your team cares about and the systems you can't switch off. Altrevo Systems adapts to your process, not the other way round.

01

Configured to fit

Part-number format, roles, project stages, columns and edit rights set up for your business from day one.

02

Extended on request

Need a field, a report, a dashboard or a whole workflow that isn't there yet? Tell us, and we'll build it into your installation.

03

Start from your own data

We bring your existing part lists, BOMs, open orders and stock across from your spreadsheets once, at go-live, so the app picks up exactly where you left off.

04

Grows with you

Your changes arrive as tested, versioned updates, so your tailored version keeps improving along with the core product.

From your request to your installation

  1. 01

    Tell us how you work

    Walk us through your process, your spreadsheets and the rules that matter to you.

  2. 02

    We propose the fit

    Configuration or a new feature, scoped and agreed with you.

  3. 03

    We deliver it

    Built, tested and installed in your Altrevo Systems as a versioned update.

Talk to us about your requirements

See it on your own BOM.

Send us a BOM, a part list or the spreadsheets your team runs on today. We'll show you how they look in Altrevo Systems, and what we would tailor for you.

We use your details only to reply to you. Privacy notice

Prefer email? contact@altrevosystems.com